Notice of Availabililty

AVAILABILITY OF TOWN OF LAKE GEORGE DRAFT 2019 ANNUAL REPORT FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4)

AGENCY: Town of Lake George

ACTION: Notice of Availability of Draft 2019 MS4 Annual Report

SUMMARY: The Director of Planning and Zoning for the Town of Lake George is providing a notice of availability of the Draft 2019 Municipal Separate Storm Sewer System (MS4) Annual Report for the Town of Lake George. The development of an Annual Report is a requirement of the MS4 General Permit issued by the Department of Environmental Conservation (DEC) and the Town of Lake George’s Stormwater Management Plan (SWMP).

DATES: The Draft 2019 MS4 Annual Report shall be posted on Wednesday April 10th, and will be available for public review until Friday May 10th. The MS4 Annual Report and any comments will be discussed at the Town Board meeting on May 13th, 2019 for possible adoption.

FOR FURTHER INFORMATION CONTACT: Dan Barusch, Director of Planning and Zoning / Stormwater Management Officer, 20 Old Post Road, Lake George, NY 12845; 518-668-5131(x5); dbarusch@lakegeorgetown.org.

April 10, 2019

Dated

Web design by Advokate

Updates by James P. Mathis

Background photo by Luke Dow